Falsework: Essential Temporary Structures in Construction

What Is Falsework Types of Falsework Causes of Falsework Failures

Falsework Means

The temporary structure used to support a permanent structure, material, plant, equipment, and people until the construction of the permanent structure has advanced to the stage where it is self-supporting. Falsework includes the foundations, footings, and all structural members supporting the permanent structural elements.

Falsework can be used to support formwork for in-situ concrete, prefabricated concrete elements, steel sections0, or stone arches, for example, during bridge construction.

What Is Falsework?

Flase work

• Falsework is defined as a temporary structure used to support a permanent structure during its construction and until it becomes self-supporting.

• Falsework may be required to support steel and timber frameworks and masonry arches as well as in situ and precast concrete construction.

• The design and construction of falsework are covered by BS 5975: 1982 Code of Practice for Falsework.

• Falsework is often constructed from conventional loose steel scaffold tubes and fittings together with adjustable telescopic props and forkheads (sometimes flat heads), which carry the main timber bearers on which the formwork or deck is built.

• Secondary beams may be interposed between the main bearers and the formwork.

• Prefabricated steel frames, military trestles, towers, steel girders, and standard steel sections are employed for more specialized work, and generally, where the load to be supported is particularly heavy.

• The total or even partial collapse of falsework may lead to serious accidents for those on the structure which are thrown from or fall from their place of work.

• More often than not, collapse occurs when the structure is being loaded, e.g., during the placing of concrete when the number of workers involved in the operations is high.

• Where other work is being undertaken below the loading level, the people involved are also at considerable risk from falling materials, i.e., both from the falsework and from the supported permanent works.

• Accidents also occur without the falsework collapsing. These are the result of people slipping or falling or both from the structure.

Falsework

• In addition to their major supporting roles, the falsework and the formwork provide a place of work, and normal edge protection requirements are necessary at all open sides and holes in the decking, as well as properly constructed access to all places where work is to be carried out (see above – Fig.).

• The collapse of falsework can be attributed to inadequate design, poor construction, or a combination of the two.

Types of Falsework

1. Shorbrace System

2. Cup-Lock Supporting System

Shorbrace System

The shorbrace support system is used widely to support the bridge deck. This system possesses many merits. One of these merits is simple and quick erection and dismantling of falsework. Also, it can be used to support heavy structures safely.

This system consists of many components as per below:

  1. Shorbrace Frame
  2. Shorebrace Telescopic Frame
  3. Vertical Frame Connector
  4. U Head Jack
  5. Cross Bracing
  6. Shorbrace Frame

Shorebrace Telescopic Frame

Shorbrace frame

These frames are the main component of falsework. It is connected with each other to form a tower of the desired height to support formwork, as shown in the figure above.

Vertical Frame Connector

horebrace telescopic fram

The function of this frame is to assist in maintaining the required height of falsework. This frame inserted inside the short brace frame then connected by load pin with the mainframe

U Head Jack

U and Post Head Jack

The soldier of formwork will place inside the U head jack. This u-head is adjustable and will contribute to providing an accurate profile of the casted slab.

Cross Bracing

Cross Bracing

This will brace adjacent shore bruce frames. The figure above shows the different components of falsework.

Cup-Lock Supporting System

Cup-lock supporting system is used widely in bridge and building construction. This system required a small space for storage. The erection and dismantling of this system are simple and quick compared to other supporting systems.

This system consists of many components as per below:

  1. Post-Head Jack
  2. U and Post Head Jack
  3. Spigot Connector
  4. Ledgers

Post-Head Jack

Post Head Jack

Standard height can vary from one to three-meter.

U and Post Head Jack

U and Post Head Jack

These items are used similarly as in shorbrace supporting system

Spigot Connector

scaffolding spigot pin connector

Spigot connector used to connect two standards in the event the height of the standard not enough

Ledgers

Ledgers are connected to standard to increase the stiffness and minimize the deformation.

Causes of Falsework Failures

In general, the primary causes of formwork disasters are

1. Excessive loads,

2. Premature removal of forms or shores, and

3. Inadequate lateral support for the shoring members.

Hadipriono and Wang (1986) examined the causes that resulted in 85 major falsework failures over the past 23 years.

Number of Occurrences Symbol Causes of failure
a. Triggering causes of failure
3 a Heavy rain causing falsework foundation slippage
1 b Strong river current causing falsework foundation slippage
1 c Strong winds
4 d Fire
5 e Failure of equipment for moving formwork
4 f Effects of formwork component failure
1 g Concentrated load due to improper prestressing operation
2 h  Concentrated load due to construction material
2 i Other imposed loads
27 j  Impact loads from concrete debris and other effects during concreting
3 k Impact load from construction equipment/vehicles
5 l Vibration from nearby equipment/vehicles or excavation work
6 m Effect of improper/premature falsework or formwork removal
20 n Other causes or not available
b. Enabling causes of failure
17 A Inadequate falsework cross- bracing/lacing
14 B Inadequate falsework component
9 C Inadequate falsework connection
7 D Inadequate falsework foundation
8 E Inadequate falsework design
4 F Insufficient number of shoring
1 G Inadequate reshoring
4 H Failure of movable falsework/formwork components
2 I Improper installation/maintenance of construction equipment
1 J Failure of permanent structure component
4 K Inadequate soil foundation
2 L Inadequate design/construction of a permanent structure
30 S Other causes or not available
C. Procedural causes of failure
23 M Inadequate review of falsework design/construction
22 N Lack of inspection of falsework/formwork during concreting
2 O Improper concrete test prior to removing falsework /formwork
4 P Employment of inexperienced/inadequately trained workmen
1 Q Inadequate communication between parties involved
5 R Change of falsework design concept during construction
38 T Other causes or not available

Tabel – 1. Causes of falsework failure (Hadipriono and Wang, 1986)

Three causes of failure were identified: triggering, enabling, and procedural causes (above table).

Clause of flasework

Figure 1. Interaction diagram between causes of falsework failure (Hadipriono and Wang. 1986)

Most failures occurred because of the interaction of the triggering and enabling events that were, in many cases, produced by inadequacies in the procedural methods (see above fig 1).

between causes of falsework failure (2)

Figure 2. Falsework collapse by types of falsework (Hadipriono and Wang. 1986)

Figure 2 shows that almost half of the building’s falsework failures were due to deficiencies in regular vertical shores.

between causes of falsework failure -2 (1)

Figure 3. Falsework collapse by construction stages (Hadipriono and Wang. 1986)

Figure 3 shows that one out of two falsework collapses occurred during concrete casting. In many cases, an excessive rate of concrete pouring and the use of powered equipment, such as motor buggies, imposed lateral forces on the falsework; several of the that were not adequately braced have come down.

Inadequate falsework cross bracing or lacings were the primary source of several falsework accidents (see table, Section b), such as the collapses of the Arroyo Seco Bridge in CA, the Skyline Center Complex in VA, the highway ramp in East Chicago, and the Coliseum in New York.

Falsework FAQ

What is falsework?

Falsework is a temporary structure used to support a permanent structure, materials, plant, equipment, and people during construction until the permanent structure is self-supporting.

When is falsework required?

Falsework is required to support various construction elements such as steel and timber frameworks, masonry arches, and both in-situ and precast concrete constructions.

What standards govern the design and construction of falsework?

The design and construction of falsework are covered by the BS 5975: 1982 Code of Practice for Falsework.

What materials are typically used for constructing falsework?

Falsework is commonly constructed using loose steel scaffold tubes, fittings, adjustable telescopic props, forkheads, timber bearers, and sometimes prefabricated steel frames, military trestles, towers, and steel girders.

What are the main components of the shorbrace system?

The shorbrace system includes components such as the shorbrace frame, shorebrace telescopic frame, vertical frame connector, U head jack, and cross bracing.

What is the cup-lock supporting system?

The cup-lock supporting system is widely used in bridge and building construction. It requires minimal storage space and allows for quick and easy erection and dismantling.

What causes falsework failures?

Falsework failures can be caused by excessive loads, premature removal of forms or shores, inadequate lateral support, environmental factors (e.g., heavy rain, strong winds), equipment failure, and inadequate design or construction.

What are the different types of causes for falsework failures?

Causes of falsework failures can be categorized into triggering causes, enabling causes, and procedural causes.

What are some specific examples of falsework failure causes?

Examples include heavy rain causing foundation slippage, strong winds, equipment failure, concentrated loads, improper prestressing operations, and vibration from nearby equipment.

How can falsework accidents be prevented?

Falsework accidents can be prevented by ensuring adequate design, proper construction, thorough inspection, adequate training for workers, and adherence to safety protocols.

What role does falsework play in construction safety?

In addition to supporting the structure, falsework provides a safe working platform. It is essential to ensure edge protection, safe access, and proper construction practices to prevent accidents.

What are the types of falsework systems used in construction?

Common types of falsework systems include the shorbrace system and the cup-lock supporting system.

How does the shorbrace system work?

The shorbrace system consists of frames that connect to form towers of the desired height, providing support for the formwork. It includes components like vertical frame connectors and U head jacks for stability and accuracy.

How does the cup-lock supporting system work?

The cup-lock system uses components like post-head jacks, spigot connectors, and ledgers to provide support. It is known for its quick assembly and dismantling process.

What are the primary components of the cup-lock supporting system?

he primary components include the post-head jack, U and post-head jack, spigot connector, and ledgers.