Estimating House Construction Costs: Basic and Detailed Methods

How to Find House Construction Cost

How to Find House Construction Cost

Any house construction work started before need some basic detail like before staring work completion. How much cost requirement in house construction. Here, Before construction, we calculate two types of construction cost

1. Basic / Ruf / Lumsum Calculation

2. Final Calculation

Basic / Ruf / Lumsum Calculation

Basic / Ruf / Lumsum Calculation is before start work calculation. This calculation, we calculate as per our working experience & thumb rule.

So, Here we calculate house construction cost as per our working experience & thumb rule. This house construction cost calculates unit in as per sq ft or sq mt. Mostly person calculates residential construction cost per sq ft. In this method, all work calculate in % as per below table.

Sr. No. Item of work Percentage of total work
1 All Type Drawing 1%
2 Excavation in ordinary soil and concrete 3%
3 Foundation 5%
4 Construction up to plinth 5%
5 Superstructure in brickwork 25%
6 Roofing including waterproofing 12%
7 Flooring 6%
8 Wood-work, i.e., Joinery, doors, and windows 13%
9 Internal finishes 6%
10 External finishes 5%
11 Water supply 5%
12 Sanitary work 5%
13 Electrification 5%
Total 100%

Above table give me basic detail for Basic / Ruf / Lumsum percentage particular cost. This percentage calculation converts into per sqft how much cost requirement as follow table.

Sr. No. Item of work Percentage of total work Enter Your House Area in Sq ft 
Construction
Rate per Sq ft
700 (as per our area) 1,500 (Working Area)
1 All Type Drawing 1% 10,500
2 Excavation in ordinary soil and concrete 5% 52,500
3 Foundation 6% 63,000
4 Construction upto plinth 6% 63,000
5 Superstructure in brickwork 25% 262,500
6 Roofing including waterproofing 12% 126,000
7 Flooring 6% 63,000
8 Wood work i.e. Joinery, doors and windows 13% 136,500
9 Internal finishes 6% 63,000
10 External finishes 5% 52,500
11 Water supply 5% 52,500
12 Sanitary work 5% 52,500
13 Electrification 5% 52,500
Total 100%  ₹1,050,000 

RufHouse Construction Cost Calculator  Excel Sheet – Download

Video tutorial for better understanding:

 

Final Calculation 

This method used the two main calculations required the first Rate of Items like Footing, RCC and second Quantity in Unite. Item rate is same of his name rate of the item, ant item rate finalization by rate analysis method

This method requires some drawings like Architecture (Plan, Elevation, Section, Masonry, Detail Drawing), Structure (Footing, Column, Slab, Beam, Etc.), MEP (Mechanical, Electrical, Plumbing) Etc. In this method as per drawing find Quantity for a different type of work as per below

1. Excavation

2. Footing

3. Backfilling

4. Plinth

5. Anti Termite

6. Plinth Protection

7. Column

8. Slab Casting

9. Brick Masonry

10. In-Side & Out Side Plaster

11. Plumbing

12. Electrical

13. Flooring

14. Door & Window

15. In-Side & Out-Side Paint

16. Cleaning

17. Reinforcement Steel

In this find, quantity required material details, like Footing. One footing How much quantity requirement details like reinforcement, shuttering, cement, aggregate, sand, water, etc. In this calculation invitational calculation of all item quantity.

How to Find Construction Cost as Below Sheet

Sr.No. Building Construction Unit Rate Qty Amount 
1 Excavation  Cum  151.00  105.96  15,999.96
2 Footing  Cum  4,623.00  1.88  88,946.52
3 Backfilling  Cum  125.00  88.40  11,050.50
4 Plinth beam  Cum  4,819.00  3.89  18,745.91
5 Anti- Termite Treatment  Sqm  69.00  93.16  6,428.04
6 Plinth Protection  Sqm  410.00  24.53  10,057.30
7 Column  Cum  4,944.00  0.76  3,757.44
8 Slab  Cum  5,106.00  9.89  50,498.34
9 Brick Masonry  Sqm  1,150.00  13.06  15,019.00
10.1 External Plaster  Sqm  395.00  310.08  122,481.60
10.2 Internal Smooth Cement Plaster  Sqm  230.00  68.04  15,649.20
11 Plumbing Rmt  200.00  465.80  93,160.00
12 Electrical Rmt  210.00  465.80  97,818.00
13 Flooring  Sqm  1,413.00  56.96  80,484.48
14.1 Door  Sqm  5,990.00  12.10  72,493.38
14.2 Window Sqm  590.00  61.60  36,344.00
15.1 Plastic Emulsion Paint Sqm  214.00  174.03  37,242.42
15.2 Apex paint Sqm  128.00  451.19  57,751.68
16 Cleaning Sqm  100.00  93.16  9,316.00
17 Reinforcement Steel  M.T.  56,753.00  4.85  274,968.29
Total Amount  1,118,212.05 

FAQs about Estimating House Construction Costs:

What factors influence the cost of house construction?

The cost of house construction is influenced by factors such as the size of the house, the quality of materials used, location-specific labor costs, complexity of design, and local building regulations.

Why is it important to estimate construction costs before starting a project?

Estimating construction costs helps in budgeting and financial planning. It ensures that the project stays within budgetary limits and allows for adjustments to be made before construction begins.

What are the advantages of using the Basic/Rough Estimate method?

The Basic/Rough Estimate method provides a quick assessment of construction costs based on generalized percentages. It is useful for initial budget planning and feasibility studies.

When should I use the Final Calculation method instead of the Basic/Rough Estimate method?

The Final Calculation method is preferred when detailed accuracy is needed. It involves itemized rates and quantities derived from architectural and engineering drawings, providing a more precise cost estimate.

How accurate are these cost estimates?

The accuracy of cost estimates can vary. Basic estimates are typically less accurate due to generalized percentages, while final calculations using detailed drawings and item rates offer higher accuracy.

What should I consider when choosing between different construction materials?

Consider factors such as durability, maintenance requirements, energy efficiency, and initial cost when choosing construction materials. These choices can significantly impact both construction costs and long-term expenses.

How can I reduce construction costs without compromising quality?

To reduce costs, consider value engineering options such as optimizing building design, exploring alternative materials, comparing multiple contractor bids, and timing construction during favorable economic conditions.

What are some common pitfalls to avoid during cost estimation?

Avoid pitfalls such as underestimating costs for specialized materials or labor, neglecting to account for contingency funds, overlooking site-specific challenges, and failing to update estimates as the project progresses.

How do I handle unexpected cost increases during construction?

It’s crucial to have a contingency fund set aside (typically 5-10% of the total project cost) to cover unexpected expenses. Regular monitoring of expenses and effective communication with contractors can help manage cost increases.

Where can I find professional assistance for construction cost estimation?

Seek assistance from architects, quantity surveyors, or construction cost consultants who specialize in estimating and managing construction costs. They can provide expert guidance and ensure accurate project budgeting.