The Building Construction Process: From Pre-construction to Final Touches

Building Construction Process (3)

TheĀ House construction StepsĀ is explained in detail below:

  1. Pre-construction Steps
    1. Acquire Land
    2. Seek Technical/Consultant
    3. Design Process
    4. Prepare Estimation and Budgets
    5. Building Permits
    6. Approach a Contractor
    7. Building Warranty Period
  2. During Building Construction Steps
    1. Site Clearance
    2. Excavation
    3. Foundation
    4. Plinth Beam or Slab
    5. Superstructure Column and Beam
    6. Brick Masonry Work
    7. Lintel Over Door Window
    8. Floor Slab or Roof Structure
    9. Plastering
    10. Door and Window Framing and Fixations
    11. Painting
    12. Electrical and Plumbing
    13. Exterior Finishing
    14. Internal Finishes
    15. Woodwork and Fixture Fittings
    16. Boundary Wall and Gates
    17. Hardscaping and Landscaping
    18. Punch List
    19. Warranty Period

Building Construction Process Two Main Parts Divided as Below.

The above main parts in sub-parts. These sub-parts related to his construction possess.

Building Construction Process from Start to Finish Pdf: Click Here

Sub Building Construction Steps with Main Building Construction

1. Pre-construction Steps

In this building construction process first step. This per construction possesses some points like plot hiring, planting, budget, consult hiring, contractor, Design process, etc.

a. Acquire Land

Acquire Land

It is the main step in building construction. Search for the location for the building, which is most appropriate for building construction purposes. Be careful while selecting land that has all the desired facilities available nearby and should be free from all land-related issues.

It’s suggested that do prior data collection before buying land either by doing research online or seek help / Consultant from real estate agents or concerned persons regarding the effective cost of the same.

b. Seek Technical/Consultant

Seek Technical / Consultant

After selecting the proper land for the building, seek the help/constant of a professional architect to create building designs, and take advice.

An architect prepare plan according to building requirement, a number of flats, shops based on your requirements also budget.

Then after architect consult with a structural engineer and MEP engineer for details of the reinforcements and other detail for use, how deep your foundation will be, the size of gravel to be used, column width, electrical, plumbing, etc.

c. Design Process

Design Process

Before finding/meeting up with an architect, make a rough requirement list for your home. This process must cover the basic concepts of your home, like living space, no: of bedrooms you would like, Guest bedrooms, hall, kitchen, Baths, where you want the stairs, car porch, Garden/landscaping/Pond, etc.

You should involve your family also, ask their likes and suggestions. Visit your friends, talk to neighbors about the pros and cons of their property, and what they would like to improve. Stages of work in a glance.

d. Prepare Estimation and Budgets

Prepare Estimation and Budgets

Building construction involves a huge quantity of material and budget. After planning and structural detailing finished, these details are transferred into the building estimator.

The building estimation will estimate the material quantity, quantity of different items of works, and prepare an abstract sheet that shows the cost of building construction.

If financial resources are limited, we will need to seek pre-approval for loans in advance, or else you might end up in a cash crunch situation.

e. Building Permits

Building Permits

This is important work to do after the project is ready to be executed. For that, we must take permission from different boards before you can go for the construction, like this municipal, airport authority, pollution control, etc.

Following are the list of document project required before applying for permission. This document may differ from state to state, but a few are essential for every building construction work.

  1. Land Survey
  2. Soil test report (SBC report)
  3. All drawing like Plan, Elevation, Section
  4. Structural Certificate
  5. Architect Certificate

f. Approach a Contractor

Approach a Contractor

A contractor for construction needs to be chosen carefully because it’s a major factor for securing building construction quality and timely construction of work.

Pre investigation has to be done about the builder before handing work. From the contract document, all of the work-related details must be clearly stated.

The contract document must cover layout and work details along with the cost payment methods and time scales. The condition of the contract ought to be thoroughly checked before signing a final deal.

g. Building Warranty Period

Building Warranty Period

Once the project is complete and handover into the owner, the contractor specifies a warranty period.

In this period, any defects found in the building constructed have to be fixed and replaced with the contractor in charge. The warranty for appliances and materials are obtained from manufacturers and supplier

2. During Building Construction Steps

In this building construction process first step. This per construction possesses some points like site clearance, Exaction, brick-masonry, plastering, as like different types of construction, etc. More detail point as per below point

a. Site Clearance

Site Clearance

Before starting any construction work, it becomes necessary to clear the place from the unwanted grass, Boulder, etc.

In case of any hill like appearance on the ground, that also has to be cleared of the excess earth, and when there’s a pit, it’s required to be filled up. This total job is known as site clearance.

b. Excavation

Excavation

Following the site clearance, the layout of this structure in the site could be planned with respect to the given foundation plans. Begin earth excavation and take trenches accordingly.

c. Foundation

Foundation

A foundation is the lower portion of building a structure that transfers its gravity loads into the earth. Foundation work is done based on drawings provided by the architect. I.e., the size of the foundation, depth, width, and length, etc. and kind of foundation (Rubble Packing or Raft and beams, etc. )

d. Plinth Beam or Slab

Plinth Beam or Slab

After the foundation work is completed, ground beam formwork preparation has been started and poured with concrete. Over the plinth beam, masonry work has been started. And space between foundation and plinth beam filled with soil.

e. Superstructure Column and Beam

Superstructure Column and Beam

The superstructure is the portion above the plinth level of the building. The main component of the superstructure is a beam and column. The columns are built up to the slab level, and the frame for further construction is prepared.

f. Brick Masonry Work

Brick Masonry Work

As beam and column framework completed, masonry work is started with various materials like fly ash bricks, concrete blocks, bricks, etc. according to building drawing.

Masonry work is done with a cement mortar mix. It’s a mixture of cement & sand. During this carefully and as per drawing, gaps are laid for windows and doors during the masonry work.

g. Lintel Over Door Window

lintel over door window

The lintel is constructed on the Window and door to support the masonry work over it. After this, further masonry work is done.

h. Floor Slab or Roof Structure

Floor Slab or Roof Structure

Then the formwork is started to construct slab resting on the column and beam. Over slab formwork, slab reinforcement is put according to slab detailed drawing.

i. Plastering

Plastering

Plastering work can commence after the initial lighting and electrical plumbing work was completed. Cement plaster is generally used with 12 mm thickness, and sometimes it may be of 20 mm thickness.

On completion of brickwork, plastering is to be done.

  1. To make the building structurally strong
  2. To protect it in the effect of weather, and
  3. To provide it an attractive look.

j. Door and Window Framing and Fixations

Door and Window Framing and Fixations

After that door and window frames have been fixed at their specified position given in drawing.

h. Painting

Painting

It is done with cement primer after initial wiring work, and plumbing works are done.

i. Electrical and Plumbing

Electrical and Plumbing

As we know that buildings have been constructed with a clean finish in which electrical and plumbing work isn’t visible.

They’re installed in the walls and slabs such that they are concealed and not visible after the finishing work is done. The pipe and point end left out this later. They may be finished with the electric fitting and plumbing fixtures.

j. Exterior Finishing

Exterior Finishing

After this work is completed, outside plastering and finishing work are started. Waterproofing can also be done to prevent rising dampness from the wall. External cladding may also be done to enhance the elevation of the house.

k. Internal Finishes

Internal Finishes

Internal walls are plaster with a smooth finish, and flooring is done with tiles. Later on, the walls are stained or painted.

l. Woodwork and Fixture Fittings

Woodwork and Fixture Fittings

By following the above step, almost construction work is completed and then after furniture work is started. Side by side, electrical fitting, switchboard, and plumbing fittings are complete in the kitchen and bathrooms areas too.

m. Boundary Wall and Gates

Boundary Wall and Gates

Compound walls must be built ideally just before beginning major construction activities. It’s to protect the site, and the material stored at the storage shed, in the outside environments, and from thieves. Latest gate designs.

n. Hardscaping and Landscaping

Hardscaping and Landscaping

Once your builder has completed your home, there is still the”hardscaping” to be done – the driveway, patio and walkways, and then the”landscaping” plan could be put into action – the irrigation system, laying of grass bed and planting of trees, as well as outdoor lighting, to be considered.

o. Punch List

Punch List

When the project is complete, the contractor inspects the whole work one by one and make a punch list. These structural units or areas that weren’t constructed properly or are below the quality level is listed in the punch list. This is later corrected by the contractor in charge.

p. Warranty Period

When the project is complete and handover into the owner, the contractor specifies a warranty period.

Within this period, any defects found in the building constructed have to be fixed and replaced with the contractor in charge. The warranty for appliances and materials are obtained from manufacturers and suppliers.

Video tutorial for better understanding:

Building Construction Process Step by Step Pdf in India : Click Here

Construction Stages of Building a House Pdf : Click Here

Residential Building Construction Process Pdf : Click Here

How to Build a House Step by Step Pdf : Click Here

FAQ: Building Construction Process

What are the key pre-construction steps in building construction?

  1. Acquire Land: Selecting a suitable plot free from legal issues and with necessary facilities nearby.
  2. Seek Technical/Consultant: Hiring an architect and consulting with structural and MEP engineers for design and planning.
  3. Design Process: Creating a detailed design plan based on requirements and budget.
  4. Prepare Estimation and Budgets: Estimating material quantities and costs, and arranging financial resources if needed.
  5. Building Permits: Securing necessary permissions from relevant authorities.
  6. Approach a Contractor: Choosing a reliable contractor and finalizing the contract.
  7. Building Warranty Period: Ensuring a warranty period for any post-construction defects.

What is involved in site clearance?

Site clearance involves removing unwanted vegetation, boulders, and excess earth. Any pits or uneven ground must be leveled to prepare the site for construction.

How is the foundation laid?

The foundation involves excavating the ground according to the foundation plan, then constructing the foundation based on the architect’s specifications, such as size, depth, and type (e.g., rubble packing, raft, beams).

What is the process for constructing the superstructure?

The superstructure, which includes the portion of the building above the plinth level, involves constructing columns and beams up to the slab level. This framework supports the subsequent construction activities.

What materials are used in brick masonry work?

Brick masonry work typically uses materials like fly ash bricks, concrete blocks, or traditional bricks. Cement mortar, a mixture of cement and sand, is used to bond the bricks together.

What is the purpose of plastering in construction?

Plastering serves to make the building structurally strong, protect it from weather effects, and provide an attractive finish. It is usually done with a cement plaster of 12 mm to 20 mm thickness.

When are electrical and plumbing installations carried out?

Electrical and plumbing installations are carried out after the initial construction of walls and slabs. These systems are concealed within the walls and slabs, with endpoints left for later finishing.

What are internal finishes and external finishing?

  1. Internal Finishes: Includes plastering walls with a smooth finish, tiling floors, and painting walls.
  2. External Finishing: Involves outside plastering, waterproofing, and cladding to enhance the building’s exterior appearance.

What is the punch list in building construction?

A punch list is created after the project’s completion, listing any structural units or areas that were not constructed properly or meet the quality standards. These items are corrected by the contractor.

What is included in the hardscaping and landscaping phase?

  1. Hardscaping: Includes constructing driveways, patios, and walkways.
  2. Landscaping: Involves installing irrigation systems, laying grass beds, planting trees, and setting up outdoor lighting.

What is the warranty period in construction?

The warranty period is specified by the contractor after project completion, during which any defects in the construction must be fixed. Warranties for appliances and materials are obtained from manufacturers and suppliers.