What is Rate Analysis?
Rate Analysis of RatesĀ is required to estimate the overall cost of a project network. A rate analysis of a project is required before the projectās tendering process. The rate of an item depends upon several factors. These factors depend on the quality and purpose of the construction. In civil engineering construction projects, the analysis of rates is carried out very carefully so that it should not exceed much.
The basis of arriving at a correct and reasonable rate per unit. Work or Supply for a particular item following its specification andĀ detailed surveyĀ ofĀ materials, labour, equipment, etc. as required for the unit work and their prevailing rates may be called an analysis of rate.
Rate analysis is the basis for arriving at a correct rate per unit work or supply of work specifications such as labor, materials, andĀ equipment.Ā It can also be defined as the analytical study that leads to the definition of unit rates of work by identifying the basic requirements.
Rate analysis for different items is calculated in different units. For example, the rate of plastering work is calculated in terms of the surface area, but the rate for brickwork is calculated in terms of the cubic meter.
The rate of different items may depend on several factors. Some of these factors are listed below:
- Work specification
- Quality of material
- Labour costs
- Labour wages
- Location of the site for the construction
- Overhead charges
- Profit
How to Use Rate Analysis for Providing and Fixing Wooden Door
This calculator is used for rate analysis for providing and fixing the wooden door. Here we will see Step by step how this calculator works.
Step ā 1. Wooden Door QtyĀ
First Enter your Rate analysis qty in nos. as shown in the below picture.
Step ā 2. Select Door AreaĀ
Enter your Door Size like length, and breadth in the meter as shown in the below picture. (Length, and Breadth andĀ in different cells)
Step ā 3. Fill Labour Charges
Enter your labour charges rate like Labour Charges for the Cost of Door Frame making, Labour Charges for Fixing hardware, and Labour Charges for Fixing of Door as per shown in the below picture. (Labour Charges for Door Frame making, Labour Charges for Fixing hardware, and Labour Charges for Fixing of Door in different cells)
Step ā 4. Fill Material Rate as Per Actual
Enter your material rate Flush Door 28mm thick ply, Wooden Frame, Wooden bidding, Laminate 1mm thick, Rubber door stopper, Tower Bolt SS 150mm – 100mm dia, Handle, Railway Hinges per door 102mm in SS,Ā and Fevicol as shown in the below picture.
( enter rat Flush Door 28mm thick ply, Wooden Frame, Wooden bidding, Laminate 1mm thick, Rubber door stopper, Tower Bolt SS 150mm – 100mm dia, Handle, Railway Hinges per door 102mm in SS,Ā and Fevico all are in different cells)
Step ā 5. Additional Cost in Rate Analysis
Check your further details like transportation cost, other charges, and contractor profit percentage. If any are changed as per your requirement than a change in cells that are shown in below cells.
Step ā 6. Final Report of Rate Analysis for Providing and Fixing Wooden Door
After completing the above steps you can check your rate analysis for providing and fixing the wooden door report in the second tab of rate analysis for concrete.
Step ā 7. Use Print Button for Print.
If you required to print your plastering work calculation you can use the print button option.
Rate Analysis for Providing and Fixing Wooden Door
[the_ad id=”39531″]
FAQ: Rate Analysis for Providing and Fixing Wooden Doors
What is rate analysis?
Rate analysis is the process of determining the correct rate per unit of work or supply for construction projects. It involves a detailed survey of materials, labor, equipment, and other factors that affect the cost of a project.
Why is rate analysis important in construction projects?
Rate analysis is crucial for estimating the overall cost of a project before tendering. It ensures that the project stays within budget and that the rates for various items are reasonable and accurate.
What factors affect the rate of different construction items?
Several factors influence the rate of construction items, including work specification, quality of materials, labor costs, labor wages, location of the construction site, overhead charges, and profit margins.
How is the rate for plastering work calculated?
The rate for plastering work is calculated based on the surface area, taking into account the cost of materials, labor charges, and other associated expenses.
How is the rate for brickwork calculated?
The rate for brickwork is calculated in terms of cubic meters, considering the cost of materials, labor, and other factors relevant to the construction.
What are the steps for performing rate analysis for providing and fixing a wooden door?
The steps for rate analysis include:
- Entering the quantity of the wooden door.
- Selecting the door area by entering the length and breadth.
- Filling in labor charges for door frame making, hardware fixing, and door installation.
- Entering the material rates for various components such as flush door ply, wooden frame, laminate, rubber door stopper, etc.
- Checking and adjusting additional costs like transportation, other charges, and contractor profit percentage.
- Reviewing the final rate analysis report.
- Using the print option if required.
How can I adjust the rate analysis to account for changes in costs?
You can adjust the rate analysis by updating the cells with the current rates for labor, materials, transportation, other charges, and contractor profit percentage.
Can I print the rate analysis report?
Yes, you can print the rate analysis report by using the print button option available in the rate analysis tool.
What materials are considered in the rate analysis for a wooden door?
The materials considered in the rate analysis include flush door ply, wooden frame, wooden bidding, laminate, rubber door stopper, tower bolt, handle, railway hinges, and adhesive like Fevicol.
Where can I find the detailed rate analysis report after completing the calculations?
After completing the calculations, the detailed rate analysis report can be found in the second tab of the rate analysis tool, specifically for concrete-related calculations.