Rate Analysis for Providing and Fixing Aluminum Doors: A Step-by-Step Guide

Rate Analysis for Providing and Fixing Aluminum Door

What is Rate Analysis?

The basis of arriving at a correct and reasonable rate per unit. Work or Supply for a particular item following its specification and detailed survey of materials, labour, equipment, etc. as required for the unit work and their prevailing rates may be called an analysis of rate.

How to Use Rate Analysis for Providing and Fixing Aluminum Door

This calculator is used for rate analysis for providing and fixing the aluminum doors. Here we will see Step by step how this calculator works.

Step – 1. Aluminum Door Qty 

First Enter your Rate analysis qty in nos. as shown in the below picture.

Qty1

Step – 2. Select Door Area 

Enter your Door Size like length, and breadth in the meter as shown in the below picture. (Length, and Breadth and  in different cells)

Door Size2

Step – 3. Fill Labour Charges

Enter your labour charges for fixing the door rate as shown in the below picture.

Labour2

Step – 4. Fill Material Rate as Per Actual

Enter your material rate aluminum frame, compact sheet, reflective glass, tower bolt, handle, lockset, railway hinges, rubber gasket, and corner cleat as shown in the below picture. ( enter rate aluminum frame, compact sheet, reflective glass, tower bolt, handle, lockset, railway hinges, rubber gasket, and corner cleat all are in different cells)

Material

Step – 5. Additional Cost in Rate Analysis

Check your further details like tools & plants, transportation cost, other charges, and contractor profit percentage. If any are changed as per your requirement than a change in cells that are shown in below cells.

Rate for Extra

Step – 6. Final Report of Rate Analysis for Providing and Fixing Aluminum Door

After completing the above steps you can check your rate analysis for providing and fixing aluminum door report in the second tab of rate analysis for concrete.

Rat Door
Rate for al

Step – 7. Use Print Button for Print.

If you required to print your plastering work calculation you can use the print button option.

Rate Analysis for Providing and Fixing Aluminum Door

 

 
Providing and Fixing Aluminum Door Data for Rate Analysis
 
Requirement data Rate Unit
 
 
 
Alumimum Door Qty Nos
 
 
 
 
L B
 
 
 
Door Length x Bearth Meter
 
 
Labour Charges
 
 
 
 
 
Labor Charges for Fixing of Door Sqm
 
 
 
Material Charges
 
 
 
 
 
Aluminum Frame Rmt
 
 
 
Compact Sheet Sqm
 
 
 
Reflective Glass Sqm
 
 
 
Tower Bolt Aluminum 150mm – 10mm dia. Nos
 
 
 
Handle Set
 
 
 
Lock Set Set
 
 
 
Railway Hinges per door 102mm in SS. Nos
 
 
 
Rubber gasket
 
 
 
Corner Cleat Pcs
 
 
 
Silicon
 
 
Rate Analysis for Providing and Fixing Aluminum Door
Sr No. Description Qty Unit Rate Cost
A Labour Charges
 
 
 
 
1 Labor Charges for Fixing of Door Sqm
B Material
 
 
 
1 Aluminum Frame Rmt
2 Compact Sheet Sqm
3 Reflective Glass Sqm
4 Tower Bolt Aluminum 150mm – 10mm dia. Nos
5 Handle Set
6 Lock Set Set
7 Railway Hinges per door 102mm in SS. Nos
8 Rubber gasket
9 Corner Cleat Pcs
10 Silicon
C Tools & Plants
 
 
D Transportation Cost 5%
 
 
E Other Charges 2 % Extra
 
 
F Add for Contractor’s Profit @15% on Items Marked
 
 
[the_ad id=”39531″]

FAQs on Rate Analysis for Providing and Fixing Aluminum Doors

What is rate analysis?

Rate analysis is the process of determining a correct and reasonable rate per unit of work or supply for a particular item, considering its specifications and a detailed survey of materials, labor, equipment, and their prevailing rates.

How do I start the rate analysis for aluminum doors?

Begin by entering the quantity of aluminum doors required in numbers.

How do I input the dimensions of the door?

Enter the door size by specifying the length and breadth in meters in the designated cells.

Where do I input the labor charges?

Enter the labor charges for fixing the door in the cell labeled for labor charges per square meter.

How do I account for material costs?

Enter the material rates for items such as the aluminum frame, compact sheet, reflective glass, tower bolt, handle, lockset, railway hinges, rubber gasket, corner cleat, and silicon in their respective cells.

Are there additional costs to consider in the rate analysis?

Yes, include further details like tools and plants, transportation costs, other charges, and contractor profit percentage. Adjust these as necessary in the provided cells.

How can I view the final report of the rate analysis?

After completing all the steps, you can check the rate analysis report for providing and fixing the aluminum door in the second tab of the rate analysis calculator.

Is there an option to print the rate analysis report?

Yes, you can use the print button option to print your rate analysis report.

Leave a Comment

Your email address will not be published. Required fields are marked *

/* */
Scroll to Top